CASE Backoffice
INFRASTRUCTURE
 
MRT PURPLE LINE
Design Completed: August, 2005
Owner :   Mass Rapid Transit Authority of Thailand
Engineer :   CASE Co., Ltd.
The Structure :   An all elevated MRT line with 23 kilometers length. Substructures consist of many types, e.g., single pier or frame. The substructures have to carry loads from mass transit vehicles.
Other Project

PROFESSIONAL ENGINEERING

  TEL : 66 (2) 103-4175
  TEL : 66 (2) 941-1061-2
  FAX : 66 (2) 941-1060
  E-MAIL : info@casethai.com

Contact Us

Civil And Structural Engineers Co.,Ltd.

51/25 Ngamwongwan Rd., Ladyao,Chatuchak,Bangkok 10900 Thailand.
© Copyright Civil and Structural Engineers Co.,Ltd. All Rights Reserved.