CASE Backoffice
INFRASTRUCTURE
 
DANANG PRIORITY INFRASTRUCTURE INVESTMENT PROJECT
DANANG, VIETNAM
Design Completed: August, 2010
Owner :   Department of Transportation, Vietnam
Engineer :   TEC Co.,Ltd., CASE Co., Ltd.
Details :   Two bridges namely as Nguyen Tri Phuong Bridge and Khue Dong Bridge over the Cai river and Cam Le river respectively shall be designed for serving 6 lanes traffic in the southern area of Danang city. The main bridge of 75m span is designed by balanced cantilever construction using prestressed concrete box girders for the superstructure. Typical approach span length is 40m and the super-T girder of 1.75m depth shall be designed for the approach span.
Other Project

PROFESSIONAL ENGINEERING

  TEL : 66 (2) 103-4175
  TEL : 66 (2) 941-1061-2
  FAX : 66 (2) 941-1060
  E-MAIL : info@casethai.com

Contact Us

Civil And Structural Engineers Co.,Ltd.

51/25 Ngamwongwan Rd., Ladyao,Chatuchak,Bangkok 10900 Thailand.
© Copyright Civil and Structural Engineers Co.,Ltd. All Rights Reserved.